Wednesday 6 March 2013

Rough Cut 2




This is our groups second rough cut, the length is only 1.40 out of 3.00. The majority of the editing is complete in the earlier sections, the later sections are not. Mainly due to extra footage that is in the process of being filmed to be added. Throughout the video we will be adding more fluid transitions between shots, utilising the fade in-fade out technique to add fluidity. Also some of the sections contain unneeded or overdone opacity changes that deter from the video. Also some of the footage is slightly out of synch, no thanks to one of our editors, Alex, all of the files moved when adding a new video track to the timeline, trying to re-synch them has taken up much of our time.

No comments:

Post a Comment